TIME REDUCTION TESTS OF RELIABILITY ELECTRICAL EQUIPMENT

DOI: 10.46573/2658-7459-2020-3-60-68

Download article

Authors

A.Y. Rusin

Abstract

It is noted that improving materials and technologies leads to increased reliability of electrical equipment. It is shown that аt the same time, the time for testing new equipment samples for reliability increases and the cost of carrying them out increases. Research results are given that can reduce the time of testing equipment for reliability.

Keywords

computer simulation, reliability testing of electrical equipment, censored samples, maximum likelihood method, test plan.